Zhangjiagang Shenzhou Machinery Co.,Ltd
Call us on:+86-512-58428808   E-mail: cch@shenzhoumac.com
Exhibition
Home > Exhibition > Content

Operation process

Source: Operation process

1. Do not want to facilitate the convenience, free to cancel the role of security doors.

2. Pay attention to observe the temperature of the pressure oil, oil temperature should not exceed the specified range. The ideal working temperature of the hydraulic oil should be kept between 45-50 ° C and is generally suitable in the range of 35-60 ° C.

3. Pay attention to adjust the trip switch, to avoid the impact of the machine in the action.

End of work

1. After the operation of the injection molding machine, the plastic in the barrel should be cleaned to prevent the oxidation of the material or long-term thermal decomposition.

2. The mold should be opened so that the toggle mechanism time is in the locked state.

3. The workshop must be equipped with lifting equipment. Assembly and removal of mold should be very careful to ensure the safety of production.

Previous: harm

Next: Before powering on

Product Categories

Fast Track

  • Feedback
    Zhangjiagang Shenzhou Machinery Co.,Ltd welcomes your comments! Please fill this form to give us feedback or report any problem when experiencing our website.
  • Quick Navigation
  • Contact Us
    Address: No.22, Zhenbei Road, Xizhang, Fenghuang Town, Zhangjiagang City, P.R. China
    Tel: +86-512-58428808    
    Fax: +86-512-58457018    
    E-mail: cch@shenzhoumac.com
Copyright © Zhangjiagang Shenzhou Machinery Co.,Ltd